- (91) It all starts here! Our pre-cut, pre-drilled package is built in our plant before it even gets to you!
- The trusses are manufactured and built in our plant and ready to load.
- Completing layout for the sonatubes or for the leg placement on a concrete pad is critical.
- Preparing for Sonatubes.
- The Sonatubes were poured!
- The layout is taking shape!
- Trucks are loaded and ready for an early morning delivery.
- A material handler can do the job. Setting the legs prior to assembly.
- (91) Families for Forty Fort Park, Forty Fort, PA 24' x 60'
- A material handler can do most of the lifting!
- (92) Legs come preassembled for a quick and easy install
- (98) New T-Leg design makes for a 13.5" beam
- (99) This pavilion isn't going anywhere with a T-Leg secured to the concrete
- Trusses arrive.
- Unloading the trusses from the trailer.
- Truss #1
- Setting Truss #1
- Moving truss #2 into place
- Booming truss #3
- Ready for Truss #4
- (93) Trusses are preassembled and boomed into place!
- The sun is still up and we are moving right along!
- The 'WOW' factor.
- Setting the main purlin to make sure the structure is level and plumb
- The main purlin is on and the sun is STILL up. This far Day #1
- Pre-cut, pre-drilled purlins make this part of the job a breeze.
- Day #2 All the purlins are on
- And we are ready to start the sheeting.
- (100) Solid blocking between the purlins lends for added strength
- (102) Solid blocking throughout the pavilion
- (101) Solid Blocking and notice the additional saddle for lighting!
- Final front view
- (97) Day 3 and ready to host community events!
- We are proud to have been a part of this community project!
- The pavilion components arrive!
- Pre-assembled legs are taken off the truck and moved to the concrete pad with a material handler.
- Steel plates and lag bolts secure the legs together. Note: a material handler with a jib is all this pavilion needed!
- Securing the legs
- The pre-assembled trusses add to the ease of the installation.
- With our pre-cut, pre-drilled design, all it takes is an impact gun and the lag bolts!
- An adult erector set!
- Add the top purlin to ensure the frame is straightened.
- Next step...purlins are ready.
- Begin loading the purlins onto the trusses.
- Purlins are pre-cut and pre-drilled for ease in securing to the trusses.
- Roof sheeting is pre-cut which allows you to move right along.
- A nail gun is all you need and the roof sheeting is complete!
- It's coming together!
- Solid steel plates add a dramatic look!
- The view of the timbers from the inside!
- Metal roofing....36"wide sheets pre-cut to length. Available in 17 colors.
- Our pre-cut, pre-drilled design is the reason this pavilion was completed in 2 days! Why spend weeks when you could be enjoying your outdoor space in days!
- It's got the 'WOW' factor!
Copyright © 2016 Mooretown Timbers and Beams, LLC